[Calculator] Data Center Build vs. Colocation TCO

November 5, 2014 Schneider Electric

This tool measures the impact of data center attributes and pricing model on TCO 

As businesses grow, their IT requirements often grow with them – eventually forcing the need for more data center capacity.  At that point, companies face a decision: build capacity within a new or existing facility that they own and operate, or outsource to a colocation facility.

Try out our cost model with our TradeOff Tool, Data Center Build vs. Colocation TCO Calculator, and use your own assumptions.

Previous Article
What is the future of cooling capacity optimization in the data center?
What is the future of cooling capacity optimization in the data center?

On a recent trip to Schneider Electric’s European Technology Center, I asked...

Next Article
Data Center Insights Ponte Vedra, FL Feb 15-17, 2015
Data Center Insights Ponte Vedra, FL Feb 15-17, 2015

Produced by nGage Events, a leader in hosted model events, DCI is an invitation-only, hosted summit designe...

×

Become a Data Center Expert - get the latest content before anyone else

Thank you
Error - something went wrong!